05 Base Camper

High Availability setup for Managing Nodes

Testing HA on 11.6 in my lab and trying to setup the config between two managers.  Based on the documentation I'm reading there doesn't appear to be a way to do this via the Web unless I have a manager of managers to config them from.  Is this true?  Also, I have performed the setup manually and it shows "Waiting for synchronization status" on the web page but I see no activity on the sync port of 1970 using Wireshark.  The HA tasks are running on the Prognosis config for both servers and the Windows Firewall is disabled.  Do I need to update the secondary server's HA config as well?  I copied the setup from the Primary with no luck.  The Secondary server states the following via the web:

 

Warning! The Prognosis node is currently not active. Please add any systems on the active node

 

Any guidance would be appreciated. 

 

 

 

 

 

 
Tags (2)
3 REPLIES 3
Highlighted
Hero

Re: High Availability setup for Managing Nodes

Hi MattAnderson,

Your understanding is correct that a manager node is needed to setup HA on a given pair. We use this manager node for all HA paring.


The "waiting for Sync status" is to wait for HA state from the HA pair, and this should take a minute or so.
If Manual Configuration is attempted, these steps must be performed on both servers in the HA Pair
https://help.prognosis.com/prognosis/116/configuration-for-ha-using-the-web-application-13599699.htm...

 

HTH

Highlighted
Community Manager

Re: High Availability setup for Managing Nodes

Hi Matt,

 

That's correct. It needs a manager of managers for HA between managing nodes. Here's a diagram.

HTH

 

Prognosis-11.6-HA-how-it-works.png

Highlighted
05 Base Camper

Re: High Availability setup for Managing Nodes

Thank you.  I'll try it with a MOM and see how that works. 

Webinar: The Journey to Microsoft Teams - Readiness Phase (part 2)

Having looked at the planning phase in session one of this series, we will turn our focus to the readiness phase. The all important technical capabilities assessment, ensuring the network, endpoints and users are adequately prepared for the move.

Hear first hand from IR's Global Head of Information Systems and Technology, Jason Schwendinger, on how he has been tackling these issues.

Join webinar
Top Liked Members